Projects
Avail Valley specializes in road construction, including interstates, private driveways, parking lots, and neighborhood roadwork. Being licensed in Wyoming and Idaho, we are able to provide construction work for everything from homes to large businesses.

Jackson Hole Classical Academy
Paved 62,650 SF of parking lot and entrances
Installed approximately 750 LF of storm drain
Provided 37,00 SF of concrete
Screened 15,000 tons of topsoil for site grading including 2 full sized soccer fields
Provided and installed 650 tons of special basalt pathway that encompasses entire campus

Hwy 89 & Strawberry Creek Rd - WYDOT
Cleared and grubbed the entire project corridor, including brush and trees
Milled and removed approximately 4,800 tons of existing asphalt surfacing
Excavated and graded over 50,200 tons of earthwork material
Placed approximately 5,400 tons of topsoil for shoulders and restoration
Installed over 7,800 linear feet of new fence (wood posts with brace panels and end panels)
Placed nearly 7,700 tons of crushed base course material
Paved approximately 3,200 tons of hot plant mix asphalt (recycle) on the main roadway and approaches
Installed 376 linear feet of 24-inch culvert pipe (6 sections)
Spread 132 pounds of seed and 247 tons of fertilizer across roughly 4 acres of disturbed area
Applied 1,446 million gallons (MG) of water for compaction, dust control, and moisture conditioning
Installed or reset 1 medium-duty cattle guard (18 ft) and reset 1 existing cattle guard
Additional asphalt-related materials: 227 tons of asphalt binder (PG 58-34), 29 tons of hydrated lime, and 4 tons of tack coat

Private Residence Driveway
Removed 12,000 square feet of old asphalt
Replaced with 70 tons of 3/4" crush and 190 tons of asphalt

Afton Wyoming Airport
Laid approximately 2,500 tons of P209 high-quality crushed aggregate base
Paved 1,750 tons of asphalt